Not in service. Brightline West is under development. The company's current target for service is late 2029 (Review-Journal, Sep 28, 2026). VegasByTrain is independent and not affiliated with Brightline West.
What it is
Brightline West describes the project as a 218-mile, all-electric high-speed rail service between Las Vegas and Southern California. Trains are planned to reach up to 200 miles per hour and to carry passengers from Las Vegas to Rancho Cucamonga in about 2 hours, which the company says is twice as fast as the normal drive. At its 2024 groundbreaking, the company said the line will run in the median of Interstate 15. Brightline West is a sister company of Brightline, which runs trains between Miami and Orlando. The Review-Journal reports that the two operate as separate entities.
Route & stations
Station 1 of 4 · planned
Las Vegas
Las Vegas Boulevard between Blue Diamond and Warm Springs roads, south of the Strip
The flagship station. A parking garage was started on part of the 110-acre site, and the Review-Journal reported in Sept 2026 that work there appears to have halted.
Brightline West's home page lists a flagship Las Vegas station plus stations in Apple Valley, Hesperia and Rancho Cucamonga. Its October 2026 press release names the stops as "Victor Valley and Rancho Cucamonga". The Review-Journal places the Las Vegas station on Las Vegas Boulevard between Blue Diamond and Warm Springs roads, on a 110-acre site. In Rancho Cucamonga, the station is designed to connect to Metrolink for downtown Los Angeles.
In May 2024, Brightline West named Siemens Mobility its preferred bidder to build ten American Pioneer 220 trainsets, subject to final agreements. The company's April 2026 construction report, filed on the MSRB's EMMA system, says car shells for the first trainset were in production in Germany.
How it's being paid for
$3 billion federal grant: announced December 8, 2023 and awarded to the Nevada Department of Transportation. The grant agreement was signed September 26, 2024.
Private activity bonds: the Review-Journal reports $2.5 billion issued by Nevada and California.
$6 billion federal RRIF loan (pending): The Bond Buyer reported in September 2026 that the company expected federal due diligence to finish by October, followed by a 90-day formal review. Bloomberg reported a decision could slip into January 2027.
$400 million equity by November 2, 2026: under its bond indentures the company must receive at least $400 million of equity (EMMA notice, Nov 21, 2025). The Fifth Supplemental Indentures moved that deadline from September 10 to November 2, 2026 (EMMA event notice, Sep 9, 2026), as reported by The Bond Buyer.
Cost: the Review-Journal reports the price rose from $9 billion to $20.1 billion. Brightline West told bondholders that the remaining budget under executed contracts is about $20.9 billion (The Bond Buyer).
Milestones
$3 billion federal grant announced
NDOT receives a $3B Federal-State Partnership grant for the project.
The Fifth Supplemental Indentures move the Equity Contribution Condition Deadline from Sep 10 to Nov 2, 2026. The company puts the remaining budget at about $20.9B.
Not directly. The planned Southern California station is in Rancho Cucamonga, where Brightline West says riders will connect to Metrolink regional rail for downtown Los Angeles and beyond.
How fast will the trains be?
Brightline West says up to 200 mph, making Las Vegas to Rancho Cucamonga about 2 hours, which it describes as twice as fast as the normal drive time.
Is Brightline West the same as California high-speed rail?
No. Brightline West is a private company’s Las Vegas–Rancho Cucamonga line. California high-speed rail is a separate state project between San Francisco and Los Angeles/Anaheim. See how the two compare.
How much will tickets cost?
Brightline West hasn’t published fares, and we won’t guess. SBCTA said in October 2026 that its board discussed fare structures that complement Metrolink.